Following the failure of the original Summer Boiler a new Keston Heat 55 system was installed.
New packaged Daikin R410a unit serving crital test ares, installed complete with pre-insullated duct work.
A reduction in the extract system performance was reported by the end user. Following a thorough investigation, a total of 11,000 bag filters were removed and cleaned, which resulted in the system again being able to operate at full efficiency.
In-depth thermal imaging survey of Biome at London Zoo to confirm efficiency of heating systems.
Carrying out repairs to high level extract ductwork, achieved with minimal disruption to plant operation.
Manufactured and installed new control panel for newly refurbished boiler room, using Keiback & Peter DDC420 Controller
Replacement of failed Hamworthy Purewell Boilers with Remeha Quinta Pro, complete with frame & header kit.
A temporary boiler was installed for the duration of the works to serve animal areas.
Installation of Midea VRF system as part of a major re-fit of laboratory test area
All Rights Reserved | Geno Kent Ltd | Company No: 10917400